Surface Water Drainage Scheme
Installation of a surface water drainage scheme including chambers, soakaways and connection to the existing network.

- Location
- Co. Carlow
- Category
- Drainage
- Services Used
- Drainage, Excavation
The requirement
The scheme had to be installed to the designed falls and levels, with chambers and soakaways positioned as drawn and the system tested before sign-off.
Challenges
Deeper runs meant trench support and careful working around existing services, with water management needed to keep the excavation safe and workable.
Our approach
Trenches were supported as they were opened and levels were checked continuously as pipes were laid, so falls stayed accurate along the full run.
The result
The completed system was tested, connected to the existing network and the ground reinstated and left tidy on completion.
Planning a groundworks or construction project?
Tell us what you are building and where. We will talk it through honestly, explain exactly what is involved, and put a clear, no-obligation quotation in front of you.



